Stop losing thousands on unexpected wall rot, layout changes, and homeowner requests. Create and sign on mobile in seconds.
No credit card required. Generate in 30 seconds.
Hidden termite/water damage discovered behind drywall; Homeowner changing paint and tile selections midway through the project.
| Description of Extra Work | Labor | Materials | Total |
|---|---|---|---|
| Demolition and reframing of load-bearing partition wall per structural review | Labor: $850 | Mat: $420 | Total: $1270 |
| Repair subfloor rot discovered beneath existing vinyl flooring (120 sq ft) | Labor: $450 | Mat: $280 | Total: $730 |
Original Contract: $45000
This Change Order: +$2000
New Contract Total: $47000
Schedule Impact: +3 Working Days
Remodeling deals with existing walls where hidden water damage, outdated wiring, or non-code framing are only exposed during demo.
Yes. Most residential construction laws require all scope and price modifications to be signed in writing prior to performing extra work.
We have specialized change order forms for Plumbing, Electrical, Roofing, and 20+ other construction trades.
View All 25+ Trade Templates →Join smart contractors who have ditched Excel. Lock in client approvals and protect your margins in under 30 seconds straight from your phone.