🏗️ Framing Toolkit

Free Framing Change Order Template

Account for structural framing revisions, beam sizing changes, and window layout modifications.

No credit card required. Generate in 30 seconds.

Common Framing Scope Changes

Upgrading standard door openings to pocket doors; Installing engineered LVL flush beam instead of drop beam.

Example Change Order Calculation

Description of Extra WorkLaborMaterialsTotal
Install two 18-ft LVL structural headers with steel platesLabor: $900Mat: $850Total: $1750
Frame coffered ceiling grid in formal dining roomLabor: $750Mat: $320Total: $1070

Original Contract: $22000

This Change Order: +$2820

New Contract Total: $24820

Schedule Impact: +3 Working Days

Why Smart Framings Are Ditching Excel

❌ The Old Way (Excel/Paper)

  • • Takes 20 minutes to calculate math and format rows on a laptop.
  • • Client forgets the verbal agreement by the time you invoice them.
  • • Crew is stuck waiting on site for signed paper to proceed.
GetChangeProof

✅ The Digital Way

  • • Generate exactly on your phone in under 30 seconds.
  • • Auto-calculates contract totals, tax, and schedule impacts.
  • • Text a secure link to the homeowner for instant mobile E-Sign.
Create Digital Sign-Off Free ⚡

Frequently Asked Questions

How to handle engineer-mandated framing changes during inspection?

Issue a Change Order citing the specific city inspector note, itemize the additional lumber, and pass through the cost.

Who pays for lumber price spikes mid-project?

If your contract has an escalation clause, issue a change order reflecting the material price difference.

📂

Looking for a different trade?

We have specialized change order forms for Plumbing, Electrical, Roofing, and 20+ other construction trades.

View All 25+ Trade Templates →
Ready to upgrade your workflow?

Stop leaving profit on the table.

Join smart contractors who have ditched Excel. Lock in client approvals and protect your margins in under 30 seconds straight from your phone.

Create Digital Change Order ⚡100% Free to UseNo credit card required