Account for structural framing revisions, beam sizing changes, and window layout modifications.
No credit card required. Generate in 30 seconds.
Upgrading standard door openings to pocket doors; Installing engineered LVL flush beam instead of drop beam.
| Description of Extra Work | Labor | Materials | Total |
|---|---|---|---|
| Install two 18-ft LVL structural headers with steel plates | Labor: $900 | Mat: $850 | Total: $1750 |
| Frame coffered ceiling grid in formal dining room | Labor: $750 | Mat: $320 | Total: $1070 |
Original Contract: $22000
This Change Order: +$2820
New Contract Total: $24820
Schedule Impact: +3 Working Days
Issue a Change Order citing the specific city inspector note, itemize the additional lumber, and pass through the cost.
If your contract has an escalation clause, issue a change order reflecting the material price difference.