Calculate extra pipe, heads, and labor, and send it to the GC for an instant signature.
No credit card required. Generate in 30 seconds.
The city inspector demanding additional sprinkler heads and pipe rerouting due to a last-minute layout change.
| Description of Extra Work | Labor | Materials | Total |
|---|---|---|---|
| Reroute sprinkler main line to avoid new HVAC ductwork clash | Labor: $850 | Mat: $320 | Total: $1170 |
| Install 4 additional concealed sprinkler heads per inspector mandate | Labor: $400 | Mat: $250 | Total: $650 |
Original Contract: $32000
This Change Order: +$1820
New Contract Total: $33820
Schedule Impact: +1 Working Days
The owner/GC. If the Fire Marshal adds requirements during inspection, the sprinkler contractor issues a change order.
Yes. If another trade routes through your designated space, the time spent redesigning the sprinkler map is billable.
We have specialized change order forms for Plumbing, Electrical, Roofing, and 20+ other construction trades.
View All 25+ Trade Templates →Join smart contractors who have ditched Excel. Lock in client approvals and protect your margins in under 30 seconds straight from your phone.