Capture extra footing depth, composite board upgrades, and cocktail rail additions without losing profit.
No credit card required. Generate in 30 seconds.
Deeper sonotube concrete footings required; Upgrading from treated pine to composite after deposit.
| Description of Extra Work | Labor | Materials | Total |
|---|---|---|---|
| Excavate 4 additional footings to 48-inch frost line depth | Labor: $600 | Mat: $350 | Total: $950 |
| Upgrade deck railing to black aluminum with top drink rail | Labor: $450 | Mat: $880 | Total: $1330 |
Original Contract: $17000
This Change Order: +$2280
New Contract Total: $19280
Schedule Impact: +2 Working Days
Inspectors often demand deeper footings if they find uncompacted fill soil. You must charge for the extra concrete and digging.
Yes, but they must sign a change order covering the restocking fee and shipping of the new material.
We have specialized change order forms for Plumbing, Electrical, Roofing, and 20+ other construction trades.
View All 25+ Trade Templates →Join smart contractors who have ditched Excel. Lock in client approvals and protect your margins in under 30 seconds straight from your phone.